General Inspection | 7/16/2020 | 7/16/2020 | 7/16/2020 | | PASS |
Michael Zawacki
|
|
|
WIP on 4 4-plexes on south of project. Everything is clean. Streets have been swept except in front of units. 2 washout pan, no dumped washout. No track out or loose trash.
|
General Inspection | 6/15/2020 | 6/15/2020 | 6/15/2020 | | FAIL |
Michael Zawacki
|
|
|
Mud tracked throughout site. None leaving site. Washouts being used, sidewalks swept, trash kept clean. Two workers parked in muddy lot, everyone else smart enough to park on pavement.
|
General Inspection | 5/13/2020 | 5/15/2020 | 5/18/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing multiple units. One unit has foundation poured and worker is working on compacting base. Washout pans at site and used, trash boxes used, also large scrap piles. Building materials are stored on empty lots. SIte fence off to keep people from cutting corners through area. No trackout or blowing trash.
|
General Inspection | 5/7/2020 | 5/7/2020 | 5/13/2020 | | CANC |
Andy J. Long
|
|
|
|
BMP Violation | 4/2/2020 | 4/6/2020 | 4/6/2020 | A | PASS |
Michael Zawacki
|
|
|
No tracking to Milwaukee. Talked with shane while on site, has crew coming tommorow to clean, mud is tacky and to wet today to get anything done.
|
General Inspection | 4/2/2020 | 4/2/2020 | 4/2/2020 | P | FAIL |
Michael Zawacki
|
|
|
Met with RP at site, follow up scheduled. Lots of mud on site and some trackout. Is having more washouts delivered to keep trucks of dirty spots. Will sweep up.
|
BMP Violation | 3/11/2020 | 3/17/2020 | 3/17/2020 | A | PART |
Michael Zawacki
|
|
|
Streets and sidewalks look like they were swept, dirt tracked back on. Wood and trusses being used to block dirt, stopping people from cutting thjrough. Dirt on road inside site, none tracking out. Site has it's own retention, any damage will be to self contained system.
|
General Inspection | 3/11/2020 | 3/11/2020 | 3/11/2020 | P | FAIL |
Michael Zawacki
|
|
|
Pics and message sent to foreman Shane. Lots of dirt on roads and sidewalks. People still going through site to cut corner. Saw unprotected inlet by washout. Follow up scheduled.
|
General Inspection | 3/6/2020 | 3/6/2020 | 3/6/2020 | P | PART |
Michael Zawacki
|
|
|
Met with owners rep at site. Area fenced off, looks like people are going through lots to still cut corner and avoid stop light. No dirt leaving site, roads within site are dirty. Work on 4 foundations, still setting forms, washout on site.
|
General Inspection | 2/18/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Michael Zawacki
|
|
|
Met with Shane, onsite foreman. Will start with 3 units. Went over controls and what to watch for.
|
General Inspection | 1/31/2020 | 2/4/2020 | 2/4/2020 | P | PASS |
Andy J. Long
|
|
|
No construciton activity. Site set up for vertical consruciton. Newly installed storm drains have sediment protection installed. Will need to set up washout once buidling permits are issued for townhomes. Street name is Network & Tutor
|
General Inspection | 1/29/2020 | 1/29/2020 | 1/31/2020 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 12/24/2019 | 12/24/2019 | 12/24/2019 | | PASS |
Andy J. Long
|
|
|
Road and infrastructure complete. Storm drain sediment bags installed. No homes started yet.
|
General Inspection | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Michael Zawacki
|
|
|
No new activity. Some people at veggie stand are parking in dirt and people cutting through area.
|
General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 | P | PASS |
Michael Zawacki
|
|
|
Site is paved and has curb and sidewalk. Ditch on south side hasn't been tiled. A few piles of cut asphalt and concrete throughout site.
|
General Inspection | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | PASS |
Michael Zawacki
|
|
|
Road and sidewalks now completed. Crew on site finishing last 6' section of sidewalk. Street and sidewalk swept, access blocked from Milwaukee.
|
Complaint Inspection | 6/6/2019 | 6/10/2019 | 6/10/2019 | A | CANC |
Andy J. Long
|
|
|
|
Complaint Inspection | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PASS |
Michael Zawacki
|
|
|
dust complaint No workers on site. No heavy machinery on site, two smaller pieces of equipment. No parked trucks, no water truck at site. No issues at time of inspection, large disturbed area.
|
Site Preparation | 5/28/2019 | 5/28/2019 | 5/28/2019 | P | PASS |
Michael Zawacki
|
|
|
Wattle on perimeter along Milwaukee, silt fence and swale protectiong southern perimeter. Site WIP, no dust. Some dirt on apron leading to Milwaukee, lloks old.
|
General Inspection | 8/12/2020 | 8/13/2020 | | P | |
Andy J. Long
|
|
|
|