DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/27/20207/27/20207/28/2020 PASS
DetailsMichael Zawacki
No work has begun on any homes, site is weed covered.
Sidewalks are all repaired and all site work looks completed.
General Inspection6/8/20206/9/20206/12/2020PPASS
DetailsAndy J. Long
Infrastructure complete. No home construciton yet.

No runoff issues observed
General Inspection6/1/20206/1/20206/8/2020PCANC
DetailsAndy J. Long
General Inspection4/27/20204/27/20204/27/2020PPASS
DetailsMichael Zawacki
No new activity. Sections of sidewalk that were ripped out still not repaired.
General Inspection3/30/20203/30/20203/30/2020 PASS
DetailsMichael Zawacki
Joint trench is completed.
Almost all sidewalks have been removed. Will need washout for repour.
General Inspection2/13/20202/13/20202/13/2020 PASS
DetailsMichael Zawacki
International Line Builders on site doing electric utilities, competitior of track. ite is clean.
General Inspection12/25/201912/25/201912/26/2019 CANC
DetailsAndy J. Long
General Inspection10/11/201910/11/201910/11/2019PPASS
DetailsAndy J. Long
No activity. No trackout. Permit posted, construction entrance installed.
General Inspection9/27/20199/27/20199/27/2019PPASS
DetailsMichael Zawacki
Sewer work and dewatering completed.
Site is currently inactive. Stabalized entrance leading to castle, no trackout. Two pieced of equipment stored at site. Ground is crusted over from rain, no blowing dust.
Met with owner, plan is to get water next week and then joint trench. Will go straight to curb and gutter and plan to be paved before winter and repair daycare parking lot.
General Inspection8/21/20198/21/20198/21/2019PPASS
DetailsMichael Zawacki
Sewer is getting inspection, if passed tere will be no more dewatering. Currently no trenches or pumps, no construction activity until results of sewer are in. No trackout or dust.
Site Preparation8/7/20198/8/20198/12/2019APASS
DetailsMichael Zawacki
Trench on site, no current dewatering, retention pond has no standing water. Out of parking lot, has been trenched, one stockpile still on pavement.
Site Preparation8/5/20198/5/20198/5/2019PPASS
DetailsMichael Zawacki
Dewatering into onsite retention with plenty of capacity. Some dust from putting drain rock into hole. Pierce looks clean, still some dust in gutter, no mud or debris in road.
Site Preparation8/1/20198/2/20198/2/2019APEND
DetailsAndy J. Long
Site not yet in full compliance. Dewatering plan submitted per NOV issued.

Approved to dewater into onsite retention and infiltration pond. Pond level must be monitored and then shut when personnel leave site.

New rock construction entrance installed off Castle, gutters swept and DI bags changed on Pierce Park, permit sign posted.

Corrections remaining:

- Pierce Park work area needs another sweeping.
- Pay fines

Follow up scheduled.
BMP Violation7/31/20197/30/20197/31/2019PFAIL
DetailsAndy J. Long
Multiple violations at site:

Compliance date: