Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberESC19-00524
StatusFinaled
Name SAM CROUSE
Site Address 749 E PARK BLVD
Project NamePark Place Apartments
Customer Number 
ePlanReviewNo
Description
Bldg 1: New multi-family apartment building
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled7/21/20207/21/20207/21/2020PPASS
DetailsAndy J. Long
all remaining ESC inspections to be recorded under ESC19-00542
General Inspection7/8/20207/8/20207/8/2020 PASS
DetailsMichael Zawacki
WIP on multiple phases.
Some area where concrete was spilled from pump truck, will need to be cleaned when dry. Multiple ecopans still on site. No loose trash or building debris. No dust or tracking.
Project is getting close to having all space covered.
General Inspection6/22/20206/22/20206/22/2020 CANC
DetailsMichael Zawacki
General Inspection6/5/20206/5/20206/5/2020 PASS
DetailsMichael Zawacki
Work on vertical and pads. Site is clean. Work on stockpiles in rear of site. Pool will start soon.
General Inspection5/21/20205/21/20205/26/2020 PASS
DetailsMichael Zawacki
Site clean and contained.
General Inspection5/6/20205/6/20205/6/2020 PASS
DetailsMichael Zawacki
Inspected 5-4.
Concrete pour on upper levels of garage. Using crane and bucket to bring up mud, washout now on south side of entrance. Some more building foundations need to be poured. Lots of framng.
Site is pretty clean, some mess around portable mixer.
BMP Violation4/16/20204/21/20204/20/2020APASS
DetailsMichael Zawacki
Pump truck had a blocked hose and was cleaned where the truck was parked. Area cleane dup, no other issues with wash out.
General Inspection4/16/20204/16/20204/16/2020 FAIL
DetailsMichael Zawacki
Two areas of dumped washout by Park gate, site does have multiple washouts.
Pictures sent to RP, follow up scheduled.
General Inspection4/1/20204/1/20204/1/2020 PASS
DetailsMichael Zawacki
Site is contained. Very wet and mucky inside site. One dump truck being loaded, will need to watch for trackout when it leaves.
General Inspection3/17/20203/17/20203/17/2020 PASS
DetailsMichael Zawacki
Road is clean and DI bags maintained. Prep work for pour on apartments and 4th deck of parking garage. Washout at site.
No issues.
General Inspection3/2/20203/2/20203/2/2020 CANC
DetailsAndy J. Long
see ESC19-00542
General Inspection2/14/20202/14/20202/14/2020 CANC
DetailsMichael Zawacki
General Inspection1/30/20201/30/20201/30/2020 PASS
DetailsMichael Zawacki
Site is muddy inside, no tracking. DIs on Park Center clean. No loose trash or messes. No contanimated areas on site. Concrete washouts in use.