Site Final | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. No ESC requests
|
General Inspection | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Michael Zawacki
|
|
|
Home about completed. Driveway still needs to be poured and lot landscaped.
|
General Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
Michael Zawacki
|
|
|
Home is being framed. Trash box on site, no messes.
|