General Inspection | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 2/4/2020 | 2/4/2020 | 2/4/2020 | | DONE |
Michael Zawacki
|
|
|
|
General Inspection | 11/19/2019 | 11/19/2019 | 11/22/2019 | P | PASS |
Michael Zawacki
|
|
|
Concrete contractor with trailer of forms at sdite. No ESC issues.
|