Site Final | 3/20/2020 | 3/23/2020 | 3/24/2020 | P | PASS |
Andy J. Long
|
|
|
Home complete and occupied. Grass is starting to grown. Temporary BMPs have been removed. No ESC requests, ESC permit finaled.
|
General Inspection | 3/20/2020 | 3/20/2020 | 3/20/2020 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 3/3/2020 | 3/3/2020 | 3/4/2020 | | PASS |
Michael Zawacki
|
|
|
Lot hydroseeded, no growth.
|
General Inspection | 2/13/2020 | 2/13/2020 | 2/14/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
Michael Zawacki
|
|
|
No issues with tackifier, no runoff from site.
|
General Inspection | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | PASS |
Michael Zawacki
|
|
|
Home is finished and lot has been tackified. No growth yet.
|
General Inspection | 11/19/2019 | 11/27/2019 | 11/27/2019 | P | PASS |
Michael Zawacki
|
|
|
Home completed. Lot has been hydroseeded. DI protection still installed.
|
General Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | PASS |
Andy J. Long
|
|
|
?WIP on installing irrigation lines. Roof top gutters are connected to subdivision stub ins. Will follow up for sweep of loose dirt from the irrigation lines.
|
General Inspection | 10/14/2019 | 10/15/2019 | 10/14/2019 | A | PASS |
Michael Zawacki
|
|
|
Home is framed and roofed, no gutters. Perimeter protected by wattle and silt fence. Some trash around site, none has blown away.
|
General Inspection | 8/15/2019 | 8/21/2019 | 8/21/2019 | P | FAIL |
Michael Zawacki
|
|
|
Construction entrance not installed as requested. Apron mostly swept, some dirt on one side. Large pile of trash in front of garage door, risk of plastic and boxes blowing away, trash box also on site.
|
BMP Violation | 8/12/2019 | 8/12/2019 | 8/15/2019 | P | PART |
Andy J. Long
|
|
|
follow up on concrete washout dump.
Concrete washout dumped on Corralero has been cleaned up as requested.
Perimter BMPs installed, no trackout, site is clean.
Correction needed: - install stabilized construction entrance
|
BMP Violation | 8/2/2019 | 8/5/2019 | 8/12/2019 | P | PEND |
Andy J. Long
|
|
|
concrete washout dumped across street in vacant lot
RP-GC has agreed to clean up. Jones Homes is on warning
|
General Inspection | 6/20/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Michael Zawacki
|
|
|
Foundation has been poured, looks like washout was hauled away. Site is clean and contained, no activity at time of inspection.
|
Site Preparation | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Andy J. Long
|
|
|
Wes Phone #: ###-####
Permit sign posted. Perimeter sediment contrlos (wattles and silt fence) installed properly. RP on site. Storm drains have sediment protection. RP states that he will have pump truck service take care of the washout instead of having onsite washout.
Excavation to begin next week. Approved for construction.
|