Site Final | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/9/2020 | 7/9/2020 | 7/9/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 | P | PASS |
Michael Zawacki
|
|
|
Exterior completed, still needs to be landscaped.
|
General Inspection | 6/10/2020 | 6/10/2020 | 6/11/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/26/2020 | 5/26/2020 | 5/29/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/7/2020 | 5/7/2020 | 5/8/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/22/2020 | 4/22/2020 | 4/24/2020 | | PASS |
Michael Zawacki
|
|
|
Exterior work about completed, home has been stained. No landscaping, site is clean and contained, no loose trash or trackout.
|
General Inspection | 3/24/2020 | 4/2/2020 | 4/2/2020 | P | PASS |
Michael Zawacki
|
|
|
Work is on interior. Outside is clean, needs to be landscaped.
|
General Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/5/2020 | 3/5/2020 | 3/5/2020 | | PASS |
Michael Zawacki
|
|
|
Met with builder at site. Area is clean, rock entrance, streets and sidewalks swept. All trash is going into box. Gutters are installed, not piped in, no down spouts installed.
|
General Inspection | 2/14/2020 | 2/14/2020 | 2/14/2020 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
Michael Zawacki
|
|
|
No runoff from storm, rear is bermed, nothing came from foundation drains. Gutter crew on site today.. Site is clean.
|
General Inspection | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | PASS |
Michael Zawacki
|
|
|
Lot is clean and contained. Gravel driveway installed, no tracking.
|
General Inspection | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Michael Zawacki
|
|
|
House is framed. Met with builder at site. Trusses have been delivered, crane was supposed to be on site this morning. A few trusses are blocking sidewalk.
|
General Inspection | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | PASS |
Michael Zawacki
|
|
|
Met with Tomn the builder at site. Area is clean. Trenching for water and sewer will need to go down driveway, will rebuild entrance after work. No esc issues.
|
General Inspection | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | PART |
Michael Zawacki
|
|
|
Foundation poured, washout on site nearly full. Some oil spills on street, absorbent has been thrown down but not yet cleaned up. Site has short entrance, wattle along sidewalk perimeter.
|
Conference | 8/12/2019 | 8/12/2019 | 8/12/2019 | A | DONE |
Michael Zawacki
|
|
|
Pictures taken and forwarded to hillside engineer. Two ads pipes and one solid pipe coming off hillside. Follow up: Hillside says they are foundation drains and will never have water flowing unless there is a water line break or something wrong. All stormwater from gutters will go to sewer and not out foundation drains.
|
Site Preparation | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Michael Zawacki
|
|
|
BMPs have been installed. Neighbor is letting them run hose until they are able to get suez on site. Will keep road and sidewalks swept. Washout will be dug before pour.
|
Site Preparation | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | CANC |
Andy J. Long
|
|
|
Dusty Phone #: ###-####
duplicate entry
|
Site Preparation | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | DONE |
Michael Zawacki
|
|
|
Met builder on site. Will not start work until 7-15. Builder will handle scheduling all inspections. No activity yet.
|