Site Final | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 9/26/2019 | 10/3/2019 | 10/4/2019 | A | PASS |
Andy J. Long
|
|
|
follow up on requests
Corrections complete. RP on site. Reviewed upcoming plans and installation details
- new storm drain sediment mats installed - new lining installed on concrete washout
|
General Inspection | 10/1/2019 | 10/2/2019 | 10/2/2019 | P | CANC |
Andy J. Long
|
|
|
follow up to corrections issued
|
General Inspection | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | FAIL |
Andy J. Long
|
|
|
Corrections needed:
- provide new lining in concrete washout, there is a rip - need to re-install sediment protection on storm drains in the subdivsion.
|