Aging Inspection | 7/1/2020 | 7/1/2020 | 7/1/2020 | | PASS |
Michael Zawacki
|
|
|
Building exterior looks completed. Some ADA work done. Site still needs to be landscaped.
|
General Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on interior. Only small disturbed area along front of home. All drainage is onto site, no issues.
|