General Inspection | 7/31/2020 | 7/31/2020 | 7/31/2020 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/15/2020 | 6/15/2020 | 6/16/2020 | | PASS |
Andy J. Long
|
|
|
Clean and stabilized perimeter. NO trackout or dirty stormwater puddles around site. Clean site.
|
General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 | | PASS |
Michael Zawacki
|
|
|
WIP on vertical. Site surrounded by fence an k-rails. Staging and storage area is on existing paved parking lot. Site is clean, no trash or dirt. Talked with PM, only concern is to clean fire insulation off road, some has fallen after spraying.
|
General Inspection | 3/13/2020 | 3/13/2020 | 3/17/2020 | | PASS |
Michael Zawacki
|
|
|
Streets around project clean. Within site clean, paved area still intact and being used for staging. Mortar mixer on site, no secondary containment but is inside building on concrete floor, washout on site.
|
General Inspection | 9/19/2019 | 9/19/2019 | 9/23/2019 | P | PASS |
Michael Zawacki
|
|
|
Met with foreman on site. Crews are laying forms and bar for footings, building will take entire lot. When they pour eco pans on site and will run sweeper behind trucks, will be using alley. Springtime they are expecting to install silva cells and have more disturbances. No dirt leaving site, no dust or any other issues.
|
Site Preparation | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
Andy J. Long
|
|
|
Mike Koci w/ ESC 8:30 AM
RP on duty, will preserve alley for site access to prevent trackout. Staging area in paved parking lot. Installed sediment filter bag on receiving storm drain at 12th and Idaho.
Will use above ground concrete washout pans.
Permit posted. Approved for construction.
|
Site Preparation | 8/5/2019 | 8/6/2019 | 8/8/2019 | P | CANC |
Andy J. Long
|
|
|
rescheduled
|
Site Preparation | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | CANC |
Andy J. Long
|
|
|
rescheduled
|