Permit Information
Permit NumberESC19-00779
StatusIssued
Name MIKE KOCI
Site Address 1100 W IDAHO ST
Project Name11th and Idaho
Customer Number 
ePlanReviewNo
Description
10-story office building located on the northwest corner of Idaho Street and 11th Street. The 0.6-acre site is currently a surface parking lot. The general area is developed with a mixture of uses and multi-story developments.

The site is located within the heart of the downtown core. 11th Street and Idaho Street are designated as "Storefront" street frontages within the Downtown Boise Design Review Standards and Guidelines. The Idaho Street and 11th Street intersection is identified as a "Gateway and High Visibility Street Corner"in the Downtown Boise Design Review Standards and Guidelines.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/31/20207/31/20207/31/2020 PASS
DetailsAndy J. Long
General Inspection6/15/20206/15/20206/16/2020 PASS
DetailsAndy J. Long
Clean and stabilized perimeter. NO trackout or dirty stormwater puddles around site. Clean site.
General Inspection4/29/20204/29/20204/29/2020 PASS
DetailsMichael Zawacki
WIP on vertical. Site surrounded by fence an k-rails. Staging and storage area is on existing paved parking lot.
Site is clean, no trash or dirt.
Talked with PM, only concern is to clean fire insulation off road, some has fallen after spraying.
General Inspection3/13/20203/13/20203/17/2020 PASS
DetailsMichael Zawacki
Streets around project clean. Within site clean, paved area still intact and being used for staging. Mortar mixer on site, no secondary containment but is inside building on concrete floor, washout on site.
General Inspection9/19/20199/19/20199/23/2019PPASS
DetailsMichael Zawacki
Met with foreman on site. Crews are laying forms and bar for footings, building will take entire lot.
When they pour eco pans on site and will run sweeper behind trucks, will be using alley. Springtime they are expecting to install silva cells and have more disturbances. No dirt leaving site, no dust or any other issues.
Site Preparation8/8/20198/9/20198/9/2019APASS
DetailsAndy J. Long
Mike Koci w/ ESC 8:30 AM

RP on duty, will preserve alley for site access to prevent trackout. Staging area in paved parking lot. Installed sediment filter bag on receiving storm drain at 12th and Idaho.

Will use above ground concrete washout pans.

Permit posted. Approved for construction.
Site Preparation8/5/20198/6/20198/8/2019PCANC
DetailsAndy J. Long
rescheduled
Site Preparation8/5/20198/5/20198/5/2019PCANC
DetailsAndy J. Long
rescheduled