DOC - Permit Finaled | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | PASS |
Andy J. Long
|
|
|
See ESC19-00806 for remaining ESC inspections on this site.
|
General Inspection | 7/10/2019 | 7/24/2019 | 7/24/2019 | P | PASS |
Michael Zawacki
|
|
|
Crew on site installing forms and rebar. Wattle on downhill side, backfill on uphill side of lot.
|
Site Preparation | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Andy J. Long
|
|
|
Clayton 9 AM
Downslope perimeter wattle is installed. Staked, trenched and overlapping at ends. Permit sign posted.
Request to install sediment protection on storm drain at bottom of Sandpoint.
Approved for construction.
|