Site Final | 4/23/2020 | 4/23/2020 | 4/23/2020 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and DI bags have been removed on Sturgeon.
|
Complaint Inspection | 4/17/2020 | 4/17/2020 | 4/23/2020 | P | PASS |
Andy J. Long
|
|
|
clogged storm drain north end of sturgeon?
Clog seems to have been due to a full DI bag.
Subdivision is near full stabilization and DI bags have now been removed. Complaint person noted that the drain was not clogged after the rain 4/22-4/23
|