General Inspection | 5/5/2020 | 5/5/2020 | 5/7/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Michael Zawacki
|
|
|
|
Tracking Control | 1/13/2020 | 1/15/2020 | 1/14/2020 | A | PASS |
Michael Zawacki
|
|
|
Met with RP. Used power broom before snow, saw no tracking.
|
Tracking Control | 1/10/2020 | 1/13/2020 | 1/13/2020 | A | DEFR |
Michael Zawacki
|
|
|
Postponed due to snow, rescheduled for 1/15
|
Complaint Inspection | 1/9/2020 | 1/10/2020 | 1/10/2020 | P | FAIL |
Michael Zawacki
|
|
|
Lots of trackout on road and sidewalk. RP has been notified, supposed to get sweeper end of day. Follow up scheduled.
|
General Inspection | 10/9/2019 | 10/9/2019 | 10/9/2019 | P | PASS |
Andy J. Long
|
|
|
WIP. Subdivsion BMPs installed (DI protection, onsite RP, concrete washout facilities)
|