Site Final | 4/22/2020 | 4/23/2020 | 4/23/2020 | P | PASS |
Andy J. Long
|
|
|
Home complete, DI bag removed on receiving stormdrain. No ESC requests.
|
General Inspection | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Michael Zawacki
|
|
|
Exterior completed, lot still needs landscaping. Area is clean.
|
General Inspection | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | PART |
Andy J. Long
|
|
|
Trash contained, no trackout. Sidewalk & gutter are fairly clean. No receiving storm drain. Violations:
-Appears washout from sites may have been dumped at corner of Targee & Quicksilver to the east of site. No washout observed onsite.
- no ESC permit sign posted.
Notified RP via voicemail. will follow up
|