General Inspection | 7/28/2020 | 7/28/2020 | 7/29/2020 | | PASS |
Michael Zawacki
|
|
|
Materials stages, some landscaping. No issues at site.
|
General Inspection | 6/12/2020 | 6/12/2020 | 6/15/2020 | | PASS |
Michael Zawacki
|
|
|
Curbing completed. Parking lot not paved and site not landscaped.
|
General Inspection | 4/17/2020 | 4/17/2020 | 4/17/2020 | P | PASS |
Michael Zawacki
|
|
|
Curbing for parking lot is completed. ROad bed mix has been added, site not paved. Sidewalkks from lot to temple not installed.
|
Site Preparation | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | PASS |
Michael Zawacki
|
|
|
Work has begun on parking lot excavation. All backfill store on lot. Parcel is connected to building to west, will have a shared drive. Work is where curb cut and entrance where, currently employees parked on street.
|