This project is for an expansion to Delta Dental of Idaho’s existing headquarters building. The existing building was constructed in 1999 and is a single-story office building. This existing building, designated for this project as building ‘A’, is to be fully renovated and a new exterior entry element and rear wall element are to be added. Within building ‘A’ will be offices, open office space, meeting rooms, a break room, and toilet rooms. Building ‘A’ will be the main point of public entry, so a large interior lobby is provided.
A new single-story office building, designated for this project as building B, is to be constructed west of building A. This new building is to be connected to the existing building with a conditioned walkway so that Delta Dental’s staff can easily walk between buildings ‘A’ and ‘B’. Within building ‘B’ will be offices, open office space, meeting rooms, and toilet rooms.
A new detached garage structure, designated for this project as building ‘C’, is to be constructed south of the main office complex. This building is for the storage of Delta Dental of Idaho’s community outreach vans, trucks, and trailers. A small conditioned storage area is provided within building ‘C’. The project includes site and landscaping work. The project also includes hvac, plumbing, electrical, and telecommunications work.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/22/20207/22/20207/22/2020 PASS
DetailsMichael Zawacki
New office is completed, work on seepage bed on west end and landscaping. Remodel work for old building, they are connected. Everything is paved and site is clean.
General Inspection6/17/20206/17/20206/17/2020 PASS
DetailsMichael Zawacki
Site has retained buffers, nothing leaving site.
Curbing completed, road bed ready for paving.
Lots of standing water in parking and staging area.
General Inspection2/20/20202/20/20202/20/2020PPASS
DetailsMichael Zawacki
Perimeter irrigation ditch has been piped and buried.
Traffic control plan still in use, no tracking. Some fill is being hauled in. ater is staying on site, there is an existing seepage bed that will continue to be used.
No loose or blowing trash.
General Inspection1/23/20201/23/20201/23/2020PPASS
DetailsMichael Zawacki
WIP on framing. Site is clean. Have good traffic plan, no tracking.
General Inspection12/24/201912/24/201912/24/2019PPASS
DetailsMichael Zawacki
Site has traffic plan with long exit into rock exit, no trackout.
Large lined washout on site and being used, some foundation work completed.
Track utilities staging on site.
Existing storm water features have bmp protection.
Site Preparation11/4/201911/7/201911/13/2019PPASS
DetailsMichael Zawacki
Met with PM/RP Brandon. Construction entrance leading to fenced off parking area, access road has been graveled all the way through. Delta Dental parking lot relocated, is 3/4 mix, will be responsibl;e for upkeep and trackout. Wattle has been placed around swales. Irragation ditch runs along perimeter, in plans to pipe it before irragation turned back on.
Existing paved parking lot will be on site through winter. No inlets at site or on Park Center.
Conference11/4/201911/4/201911/4/2019PPASS
DetailsAndy J. Long
RP Brandon called to notify that site is starting to mobilize. The first operation is to compete a
parking area for Delta Dental employees.

ESC site preparation inspection will occur Thursday once initial BMPs are installed.