General Inspection | 7/22/2020 | 7/22/2020 | 7/22/2020 | | PASS |
Michael Zawacki
|
|
|
New office is completed, work on seepage bed on west end and landscaping. Remodel work for old building, they are connected. Everything is paved and site is clean.
|
General Inspection | 6/17/2020 | 6/17/2020 | 6/17/2020 | | PASS |
Michael Zawacki
|
|
|
Site has retained buffers, nothing leaving site. Curbing completed, road bed ready for paving. Lots of standing water in parking and staging area.
|
General Inspection | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | PASS |
Michael Zawacki
|
|
|
Perimeter irrigation ditch has been piped and buried. Traffic control plan still in use, no tracking. Some fill is being hauled in. ater is staying on site, there is an existing seepage bed that will continue to be used. No loose or blowing trash.
|
General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing. Site is clean. Have good traffic plan, no tracking.
|
General Inspection | 12/24/2019 | 12/24/2019 | 12/24/2019 | P | PASS |
Michael Zawacki
|
|
|
Site has traffic plan with long exit into rock exit, no trackout. Large lined washout on site and being used, some foundation work completed. Track utilities staging on site. Existing storm water features have bmp protection.
|
Site Preparation | 11/4/2019 | 11/7/2019 | 11/13/2019 | P | PASS |
Michael Zawacki
|
|
|
Met with PM/RP Brandon. Construction entrance leading to fenced off parking area, access road has been graveled all the way through. Delta Dental parking lot relocated, is 3/4 mix, will be responsibl;e for upkeep and trackout. Wattle has been placed around swales. Irragation ditch runs along perimeter, in plans to pipe it before irragation turned back on. Existing paved parking lot will be on site through winter. No inlets at site or on Park Center.
|
Conference | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | PASS |
Andy J. Long
|
|
|
RP Brandon called to notify that site is starting to mobilize. The first operation is to compete a parking area for Delta Dental employees.
ESC site preparation inspection will occur Thursday once initial BMPs are installed.
|