General Inspection | 8/11/2020 | 8/11/2020 | 8/12/2020 | | PASS |
Michael Zawacki
|
|
|
WIP on interior of final units.
|
General Inspection | 7/27/2020 | 7/27/2020 | 7/28/2020 | | PASS |
Michael Zawacki
|
|
|
WIP. No issues.
|
General Inspection | 7/10/2020 | 7/10/2020 | 7/10/2020 | | PASS |
Michael Zawacki
|
|
|
WIP on final units
|
General Inspection | 6/25/2020 | 6/25/2020 | 6/25/2020 | | PASS |
Michael Zawacki
|
|
|
Exterior work on building completed. Crews on site doing interiors.
|