General Inspection | 7/30/2020 | 7/30/2020 | 7/30/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/15/2020 | 7/15/2020 | 7/15/2020 | | PASS |
Michael Zawacki
|
|
|
WIP on framing of last building. No issues at site.
|
General Inspection | 6/26/2020 | 6/26/2020 | 6/26/2020 | | PASS |
Andy J. Long
|
|
|
|