General Inspection | 8/7/2020 | 8/10/2020 | 8/10/2020 | P | PASS |
Andy J. Long
|
|
|
Home framed, no landspaing yet. No trackout, dust, trash, or discharge issues observed.
|
General Inspection | 7/30/2020 | 7/30/2020 | 8/7/2020 | | CANC |
Andy J. Long
|
|
|
|
Tracking Control | 4/1/2020 | 4/3/2020 | 4/3/2020 | A | PASS |
Michael Zawacki
|
|
|
Talked with RP. Site cleaned
|
Tracking Control | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | FAIL |
Michael Zawacki
|
|
|
Some trackout from site going down hill. Also has genie lift making some mess. RP notified and follow up scheduled.
|
General Inspection | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | PASS |
Michael Zawacki
|
|
|
Met with builder on site. Rear of property has large natural buffer, will add BMPs if anything starts to flow down hill. Lined washout installed. Rock entrance in front.
|
General Inspection | 12/17/2019 | 1/6/2020 | 1/6/2020 | P | PASS |
Michael Zawacki
|
|
|
Lot has survey stakes, no building activity.
|
Site Preparation | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | PASS |
Andy J. Long
|
|
|
Approved to begin initial site work. No receiving stormdrains. Discuseed preserving vegetation and obeying clearing limits. Will install construction entrance and lined washout. Excavation work to begin early January.
|