General Inspection | 8/5/2020 | 8/5/2020 | 8/5/2020 | | PASS |
Michael Zawacki
|
|
|
Concrete and pump truck on site, will be pouring retaining wall between buildings. Liner located with all concrete tools, no washout made yet. Building work is all interior.
|
Tracking Control | 2/13/2020 | 2/13/2020 | 2/13/2020 | P | DONE |
Michael Zawacki
|
|
|
Apron is clean and no trackout onto hill. Inside development the road is muddy by new construction.
|