General Inspection | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing. Site is clean and contained, no issues.
|
General Inspection | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | PASS |
Michael Zawacki
|
|
|
Foundation has been poured, some trenches for utilities. Backfill is on site, no perimeter BMPs, there is grass and all dirt is contained. Did not see a washout on site, did not see any illicit washout. Lots of mud was dumped within foundation.
|