General Inspection | 8/13/2020 | 8/13/2020 | 8/13/2020 | P | PASS |
Michael Zawacki
|
|
|
Home exterior completed. Brooks on site working on pad for driveway. Site still needs landscaping.
|
General Inspection | 3/26/2020 | 3/26/2020 | 3/26/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing. Site is contained, no tracking to Boise ave.
|
General Inspection | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | PART |
Michael Zawacki
|
|
|
Hauling in fill for foundation. Some tracking, talked to excavator, they will clean it when done.
|