General Inspection | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on interior, exterior looks completed. No issues, still haven't paid fine.
|
BMP Violation | 2/25/2020 | 2/27/2020 | 2/27/2020 | A | PASS |
Michael Zawacki
|
|
|
Washout removed.
|
BMP Violation | 2/19/2020 | 2/25/2020 | 2/25/2020 | A | FAIL |
Michael Zawacki
|
|
|
Washout not cleaned. RP said they would get it cleaned. Excavator pulled onto site while I was there. Follow up scheduled to see if they scrape it up.
|
General Inspection | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | FAIL |
Michael Zawacki
|
|
|
Dumped washout, rp notified, reinspection scheduled. Reinspection fee added.
|