General Inspection | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing. Site is clean, no loose trash, wood scaps all piled next to trash box. Clean rock drive installed, no one parked in dirt.
|
General Inspection | 1/23/2020 | 1/29/2020 | 1/28/2020 | A | PASS |
Michael Zawacki
|
|
|
Check if washout used. No dumped washout, looks like they hauled away. Talked to neighbor said they poured Thursday, truck was in front. No spills.
|
General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | PASS |
Michael Zawacki
|
|
|
Talked to concrete foreman while at site. Currently setting forms, plan on pouring tommorow. Told him he needs washout or to have it hauled away. Will follow up next week to look for dumped washout. Backfill on site, natural buffer, deep rock entrance.
|