General Inspection | 4/9/2020 | 4/9/2020 | 4/15/2020 | P | PEND |
Andy J. Long
|
|
|
|
Tracking Control | 4/2/2020 | 4/3/2020 | 4/8/2020 | A | PEND |
Andy J. Long
|
|
|
|
General Inspection | 3/27/2020 | 3/30/2020 | 4/2/2020 | P | FAIL |
Andy J. Long
|
|
|
Trackout and dirty gutter on Alpine. No construction entrances
Follow up scheduled to see if they clean up...
|
Site Preparation | 2/10/2020 | 2/10/2020 | 2/11/2020 | P | NR |
Andy J. Long
|
|
|
Initial site work and demolition has started. No discharges or trackout, but no perimeter BMPs installed yet or construction entrance off Alpine. Receiving storm drain is on Alpine several blocks to the west. Will recommend gutter bag check dam instead of filter bag.
NO crew onsite at time of inspection, voicemail box of RP is full. Will try again.
|