General Inspection | 5/21/2020 | 5/21/2020 | 5/21/2020 | P | PASS |
Andy J. Long
|
|
|
Permit posted, washout pan on site. RP answered phone
Gene 986 200 2232
|
General Inspection | 5/13/2020 | 5/18/2020 | 5/18/2020 | P | PASS |
Michael Zawacki
|
|
|
Small crew on site setting forms and rebar. Spoke with PM, washout pans will be replaced day before pour. Also left them a permit sign.
|
General Inspection | 4/23/2020 | 5/7/2020 | 5/13/2020 | P | CANC |
Andy J. Long
|
|
|
rescheduled
|
Site Preparation | 4/23/2020 | 4/23/2020 | 4/23/2020 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation. Concrete washout pan on site. No loose trash. No trackout. No crew onsite. Will post ESC permit sign next inspection.
|