General Inspection | 8/11/2020 | 8/11/2020 | 8/12/2020 | P | PASS |
Andy J. Long
|
|
|
WIP. Minor trackout. Pouring concrete. Follow up scheduled to check on concrete washout BMP used at site.
|
Tracking Control | 7/2/2020 | 7/3/2020 | 7/2/2020 | P | PASS |
Andy J. Long
|
|
|
3 pm
Trackout has been cleaned up and street swept. Construciton entrance is angular rock, correct length, and has an under lining. Soure of mud is disturbed area adajecnt to exising asphalt entrance. RP lined area with cones. Next week construction/stabilization of this area will begin. Walked site to check for any trouble or ponding spots haul traffic should avoid.
ESC permit sign posted. Trackout fine issued paid. Parcel hold can be removed.
|
Tracking Control | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | FAIL |
Andy J. Long
|
|
|
Trackout within paved site access and out to Latah. No ESC permit sign, no construction entrance. NO clean up after trackout.
ESC special site fee assessed and parcel hold placed on site for all BLD and trade inspections until construction entrance is installed.
|
Tracking Control | 6/11/2020 | 6/11/2020 | 6/16/2020 | P | PEND |
Andy J. Long
|
|
|
Site was cleaned up last week with sweepig and maintenace of entrace. It is getting muddy again. Will continue to monitor site.
|
Tracking Control | 6/9/2020 | 6/11/2020 | 6/11/2020 | A | CANC |
Andy J. Long
|
|
|
|
Tracking Control | 6/9/2020 | 6/9/2020 | 6/9/2020 | P | FAIL |
Andy J. Long
|
|
|
Trackout within site stabilzed area and onto Latah Street northbound.
Final trackout warning issued. Correction requests:
- sweep up Latah Street - sweep/rinse (if water can be contained onsite) exisitng asphalt within site - refresh rock construction entrance - prohibit employee parking in the dirt or mud, set up parking area on stabilized area
Follow up scheduled for Thursday morning.
|
Tracking Control | 6/3/2020 | 6/5/2020 | 6/4/2020 | P | PASS |
Andy J. Long
|
|
|
No construction activity. Park areas have revegetated well. Still monitoring the area between veterans pond and green bike path.
Will check with Boise Parks project manager to see if all work is complete.
|
Tracking Control | 5/29/2020 | 6/1/2020 | 6/3/2020 | P | PEND |
Andy J. Long
|
|
|
NO trackout to Latah. Interior pavement is still very dirty.
Notified Carlo they can rinse the road as long as the rinse water stays on site.
Posted ESC permit sign. Will follow up
|
Tracking Control | 5/28/2020 | 5/28/2020 | 5/29/2020 | P | FAIL |
Andy J. Long
|
|
|
Correction request to sweep up existing asphalt leading to construction area and work on improving trackpad.
Notified RP Amy. Follow up inspection scheduled.
|
Site Preparation | 4/1/2020 | 4/1/2020 | 4/2/2020 | P | PASS |
Andy J. Long
|
|
|
Contractor/RP provided photos of initial BMPs installed at site.
Approved for construction
|
General Inspection | 8/12/2020 | 8/14/2020 | | A | |
Andy J. Long
|
|
|
|