General Inspection | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | PASS |
Andy J. Long
|
|
|
Lined rock entrance installed and maintained. All potential receiving storm drains have sediment protection. Perimeter vegetation and trees preserved. RP on duty.
Very well managed site.
|
Site Preparation | 5/18/2020 | 5/20/2020 | 5/21/2020 | A | PASS |
Andy J. Long
|
|
|
10 AM w/ Phil Allen ###-####
BMPs installed per site plan and correctly including: - construction entrance - storm drain inlet protection in parking lot (2), and 1 on Overland, 1 on Five Mile traffic plan with a one way flow - secondary containment for portapots - perimeter features preserved along both roads, including a silt fence. Some trees along ROW to remain, ones within the parking lot to be removed. - will use ecopan for washout - workers will park offsite to prevent trackout - permit sign will be posted at entrance
Approved for construction
Need to change RP to Phil Allen.
|