Site Final | 5/18/2020 | 5/18/2020 | 5/19/2020 | P | NR |
Andy J. Long
|
|
|
Work complete.
Will continue to monitor site. Americana hillside above chain link fencing needs more time to show that vegetation will establish in this disturbed area
|
Site Final | 4/7/2020 | 4/7/2020 | 4/9/2020 | P | NR |
Andy J. Long
|
|
|
check on revegetation implementation
Project near completion. HIllside on American has been broadcast seeded and has the original topsoil in it. Will check back for vegetation and check with Parks n Rec project manager.
Request to remove unused wattle and stakes and do final sweep along parking lot curb next to staging yard.
|
Site Preparation | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | PASS |
Andy J. Long
|
|
|
Initial BMPs set up.
- Construction entrance installed with lining and angular rocks - sweeper unit on site to clean up trackout in parking lot - construction fencing designating limits of disturbance - sediment control wattle placed between pond bank and disturbed area by site entrance - ESC permit sign posted
|