General Inspection | 7/9/2020 | 7/9/2020 | 7/9/2020 | P | PASS |
Michael Zawacki
|
|
|
Foundation work completed and backfill graded back into place. Some run on from neighbors irrigation.
|
General Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 | P | PASS |
Michael Zawacki
|
|
|
One worker on site pulling forms. Lined washout was brought and used for pour.
|
BMP Violation | 6/10/2020 | 6/17/2020 | 6/17/2020 | A | PASS |
Michael Zawacki
|
|
|
Washout made of silt fence removed. No new concrete work.
|
BMP Violation | 6/8/2020 | 6/10/2020 | 6/10/2020 | A | FAIL |
Michael Zawacki
|
|
|
Used silt fence for washout. Not cleaned and no proper washout installed. No new pours. Follow up scheduled. Will fine site if they pour again before fixing washout.
|
General Inspection | 6/8/2020 | 6/8/2020 | 6/8/2020 | P | FAIL |
Michael Zawacki
|
|
|
Used silt fence for washout, allows water to seep through. Message sent to RP to clean it up and install leak proof washout. Follow up scheduled.
|
Site Preparation | 5/8/2020 | 5/11/2020 | 5/13/2020 | P | PASS |
Michael Zawacki
|
|
|
No activity has begun, installed permit sign at site.
|
Conference | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | DONE |
Andy J. Long
|
|
|
late am // MItch Phone #: ###-####
Discussed project and BMP with RP-GC. GC replaced DI bag in front of project. Will preserve vegetation outside of footpring. Will use concrete washout containmnet.
Follow up site prep schedulled to post sign
|