General Inspection | 4/16/2020 | 4/16/2020 | 4/16/2020 | P | PASS |
Michael Zawacki
|
|
|
Dewatering follow up. Done with dewatering, road is patched. Still some water in on site retention.
|
Conference | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | PASS |
Michael Zawacki
|
|
|
Hit groundwater. Check on dewatering. Met with contractor on site. Plans on pumping into lot, has dug pit and bermed. Sewer inspector will let us know if there is any issues.
|