General Inspection | 5/11/2020 | 5/11/2020 | 5/11/2020 | P | PASS |
Michael Zawacki
|
|
|
Foundation has been poured, washout used. Backfill is right up to sidewalk, will need to see perimeter after they fill. No workers at site at time of inspection. Sunroc truck pulled in and was supposed to be meeting guys on site.
|