General Inspection | 6/16/2020 | 6/16/2020 | 6/16/2020 | P | PASS |
Michael Zawacki
|
|
|
Inspected both homes and met with both RPs. No flow off of front of sites. Some rilling on rear hill, verry small. All followed fall line and went to wattles. Will clean up hill when dry enough to walk on without causing damage. Grass is starting to grow on hillside.
|
General Inspection | 5/21/2020 | 5/22/2020 | 5/26/2020 | A | PASS |
Michael Zawacki
|
|
|
Foundation has been poured, backfill still not replaced. No esc issues, no issues on hillside.
|
General Inspection | 4/30/2020 | 4/30/2020 | 5/1/2020 | P | PASS |
Michael Zawacki
|
|
|
No hydroseeding yet. Hillside has no issues from rain. Talked to builder about flattening stockpiles. Will use topsoil to bring site to grade once foundation poured.
|
General Inspection | 4/14/2020 | 4/14/2020 | 4/14/2020 | P | PASS |
Michael Zawacki
|
|
|
Lot is stripped to grade. Topsoil is stored on site. No esc issues.
|
Complaint Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 | P | PASS |
Michael Zawacki
|
|
|
No issues with hillside. All water absorbed, no ruts or rills. No dirt leaving out bottom of site.
|
General Inspection | 3/24/2020 | 3/25/2020 | 3/25/2020 | P | PASS |
Michael Zawacki
|
|
|
Topsoil is stockpiled in front portion of lot. Spiers on site working on grading of lot and hillside. No issues.
|
Site Preparation | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | PASS |
Michael Zawacki
|
|
|
Met with owner/builder and did site walk. Will begin with stripping topsoil and will keep it stockpiled. Will provide entrance for when hauling fill. Will do lifts on rear hill. Currently only grading approved, will not build yet.
|