Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberESC20-00343
StatusFinaled
Name BRAD ANDERSON
Site Address 80 S COLE RD
Project NameMOUNTAIN WEST BANK SITE IMPROV
Customer Number 
ePlanReviewNo
Description
Included in this application will be new paving, grading and storm water. ESC plan approved for exterior site improvement. Install perimter sediment control wattle per site plan, protect existing storm drains to remain. ESC site preparation inspection is required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/8/20206/8/20206/9/2020PPASS
DetailsMichael Zawacki
General Inspection5/27/20205/27/20205/27/2020PPASS
DetailsMichael Zawacki
Curbing work completed. Site iss prepped for paving, all below surrounding grade. Landscapers on site working on parking islands and perimeters.
MTI is on site testing road bed before paving.
Site Preparation4/24/20204/27/20204/27/2020PPASS
DetailsMichael Zawacki
Met RP on site. DIs are all protected. Crew is on site to start saw cutting. Will bring pan for washout when pours begin. Don't plan on stripping parking lot until two days before paving. Will need to do some site compaction work for bed.