General Inspection | 7/31/2020 | 7/31/2020 | 8/6/2020 | P | PASS |
Michael Zawacki
|
|
|
Slab poured, work on vertical cinder block walls. Mortar mixer is on tarp, washout on site. Site is fenced in and contained.
|
General Inspection | 6/15/2020 | 6/16/2020 | 6/16/2020 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation and utilities. Site has a contained perimeter. Bannock Street is closed for water line work. Job trailer is in alley, ESC permit sign posted. No trackout, spills, trash, or discharges observed.
|