Site Preparation | 7/21/2020 | 7/22/2020 | 7/24/2020 | A | PASS |
Andy J. Long
|
|
|
Mike Mann ###-####
BMPs installed. ESC plan being implemented. RP on duty. Will pour next week, RP aware of washout requiements and will use drip tarp/secondary containment under the pump truck
Approved.
|