General Inspection | 8/3/2020 | 8/3/2020 | 8/3/2020 | P | PASS |
Michael Zawacki
|
|
|
Only exterior work is on garages, all homes framed. Lots of activity at site. Some debris on ground, will need to be swept when there is no vehicles.
|
General Inspection | 6/29/2020 | 6/29/2020 | 6/29/2020 | P | PASS |
Michael Zawacki
|
|
|
Multiple units framed. Crew on site is working inside. Some building material blocking sidewalk.
|
General Inspection | 6/2/2020 | 6/2/2020 | 6/2/2020 | P | FAIL |
Michael Zawacki
|
|
|
Washout dumped at end of block. Fee and hold assigned to other address. Besides washout site is clean, almost all foundations poured.
|