General Inspection | 6/29/2020 | 6/29/2020 | 6/29/2020 | P | PASS |
Michael Zawacki
|
|
|
Multiple units framed. Crew on site is working inside. Some building material blocking sidewalk.
|
BMP Violation | 6/2/2020 | 6/3/2020 | 6/4/2020 | A | PASS |
Michael Zawacki
|
|
|
Dumped washout has been cleaned and lined washout installed. Called permit tech to lift hold, notified listed RP site was in compliance and good to go.
|
BMP Violation | 6/2/2020 | 6/2/2020 | 6/2/2020 | P | FAIL |
Michael Zawacki
|
|
|
Washout dumped on end of block. Fee and trade hold assigned to address, pictures sent to RP.
|