Site Preparation | 8/7/2020 | 8/10/2020 | 8/10/2020 | P | PASS |
Andy J. Long
|
|
|
WIP on hauliing out excess rock and material to approved location. Will install BMPs after initial excavation.No trackout or fugtive dust observed.
Posted ESC permit sign.
|
Site Preparation | 8/7/2020 | 8/7/2020 | 8/7/2020 | P | PASS |
Andy J. Long
|
|
|
Will be moving equipment to site today and starting on Monday Phone #: ###-#### Inspection requested via web by bryan murdoch
Approved for mobilization. Follow up inspection scheduled
|