Site Preparation | 7/29/2020 | 7/29/2020 | 7/30/2020 | P | PASS |
Michael Zawacki
|
|
|
Met with excavator at site. Has begun digging for foundation, has backfill by alley and is hauling material out. Has water on site and using it for dust control. Gave them permit sign, will get info up.
|