Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR00-00072
StatusFinaled
Name TREASURE VALLEY FIRE
Site Address 312 S 9TH ST
Project NameSPR FOSTER GARAGE
Customer Number 
ePlanReview 
Description
FOSTER BLOCK PARKING GARAGE - TO FIRE SPRINKLER A NEW 213,750 SQ. FT., EIGHT-TIER, POST-TENSIONED CONCRETE PARKING STRUCTURE (593 STALLS) WITH A 5385 SQ. FT. BASEMENT AREA. THE NORTHWEST CORNER OF STRUCTURE AT GROUND LEVEL HAS A FUTURE OFFICE TENANT SPACE. THIS OFFICE SPACE IS APPROVED FOR SHELL & CORE CONSTRUCTION ONLY. THIS BUILDING TO BE FULLY FIRE SPRINKLERED. ALL SPRINKLER WORK PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. THE GRADING AND FOUNDATION/BASEMENT WORK ARE BEING COMPLETED UNDER SEPARATE PERMITS. FOUNDATION PERMIT BLD99-1088, GRADING PERMIT BLD99-1262. DRH98-0244, BLD99-02049 *JWA*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/30/200010/30/200010/30/2000PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 10/30/2000 final okay tested all dry valves, pump,and valves, etc. final okay 10/30/2000 2:05:55 PM
INSP-Final Inspection10/25/200010/26/200010/26/2000PFAIL
DetailsRick Jackson
Don ###-#### pager alarms not complete 10/26/2000 4:35:45 PM
INSP-Sprinkler Rough-in/Hydro10/23/200010/23/200010/23/2000PPART
DetailsRick Jackson
Don ###-#### pager hydro on standpipes okay 10/24/2000 8:00:38 AM
INSP-Sprinkler Rough-in/Hydro10/20/200010/20/200010/20/2000PPART
DetailsRick Jackson
r/i don pager ###-#### hydro okay - still need hydro on standpipes 10/23/2000 10:51:01 AM
INSP-Sprinkler Rough-in10/16/200010/17/200010/17/2000PPART
DetailsRick Jackson
pump test don ###-#### pager tested pump for flow - okay; alarms not complete 10/18/2000 10:01:23 AM
INSP-Sprinkler Rough-in/Hydro8/7/20008/8/20008/8/2000APART
DetailsRick Jackson
hydro on the underground and a flush ###-#### don pager hydro okay on underground 8/8/2000 11:22:53 AM
INSP-Supply line flush8/8/20008/8/20008/8/2000ANR
DetailsRick Jackson
not ready to test FDC 8/8/2000 11:23:22 AM
INSP-Supply line flush8/8/20008/8/20008/8/2000PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 8/8/2000 undergound flush of FDC and supply line okay 8/9/2000 8:28:36 AM
INSP-Sprinkler Rough-in8/2/20008/2/20008/2/2000PNR
DetailsRick Jackson
don-- pager ###-#### unground insp Don caled and said he would reschedule for 8/3 8/3/2000 7:48:26 AM
INSP-Sprinkler Rough-in5/2/20005/2/20005/1/2000 PART
DetailsRick Jackson
preliminary walk through of sprinklers - pump not installed; FDC,PIV not complete; work completed up to 4th floor okay