INSP-Final Inspection | 6/5/2003 | 6/5/2003 | 6/5/2003 | A | PASS |
Troy Cobbley
|
|
|
I'm doc finalling this project based on the structural inspector giving it a final occupancy on 9/6/2000. See building permit history
|
INSP-Final Inspection | 6/20/2000 | 6/21/2000 | 6/21/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 06/20/2000 at 09:58:01. Contact: ###-####. Final fail install intermediate temp. head over fireplace 6/21/00 4:48:35 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/17/2000 | 2/17/2000 | 2/17/2000 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 02/17/2000 at 08:13:08. Contact: ###-####. Ok on above ground hydro test and sprinkler R/I. 2/18/00 9:51:13 AM
|