INSP-Final Inspection | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 9/12/2001 4:08:02 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/9/2000 | 6/12/2000 | 6/12/2000 | P | PART |
Joe Tawney
|
|
|
above ground Jeff ###-#### OK ON ABOVE AND UNDERGROUND TESTS
|
INSP-Supply line flush | 6/9/2000 | 6/9/2000 | 6/9/2000 | P | PART |
Joe Tawney
|
|
|
Jeff ###-#### Ok on supply line flush 6/13/00 11:37:51 AM
|
INSP-Sprinkler Rough-in | 5/16/2000 | 5/17/2000 | 5/17/2000 | A | PART |
Joe Tawney
|
|
|
###-#### Ok on sprinkler R/I for phase 2. 5/17/00 2:05:03 PM
|
INSP-Sprinkler Rough-in | 4/21/2000 | 4/21/2000 | 4/21/2000 | P | PART |
Joe Tawney
|
|
|
jeff ###-#### Ok on area "C" section 2 open area only. 4/24/00 1:02:21 PM
|
INSP-Supply line flush | 3/20/2000 | 3/21/2000 | 3/21/2000 | A | PART |
Joe Tawney
|
|
|
SUPPLY LINE COVER-- JEFF ###-#### Ok on supply line cover 3/22/00 9:21:16 AM
|