INSP-Final Inspection | 8/29/2001 | 8/29/2001 | 8/29/2001 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 8/29/2001 9:24:53 AM
|
INSP-Final Inspection | 8/16/2000 | 8/16/2000 | 8/16/2000 | P | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 8/16/2000 dry system must be completed by 8/30/00 per approval by letter from Dave Miller
|
INSP-Final Inspection | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/03/2000 at 09:04:11. Contact: ###-####. trip teswt of dry system took 78 seconds, system is approximately 800 gallons 8/4/2000 3:51:35 PM
|
INSP-Final Inspection | 8/2/2000 | 8/3/2000 | 8/3/2000 | P | CANC |
Rick Jackson
|
|
|
###-#### needs to be late pm Disp set to [CANC] by a contractor via Hello! on 08/03/2000 at 09:00:22.
|
INSP-Sprinkler Rough-in/Hydro | 7/24/2000 | 7/24/2000 | 7/24/2000 | P | PASS |
Rick Jackson
|
|
|
nathan-- ###-#### hydro insp hydro and r/i okay 7/24/2000 3:01:32 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/7/2000 | 7/7/2000 | 7/7/2000 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/07/2000 at 07:42:59. Contact: ###-####. Ok to cover foyer only 7/10/00 10:22:56 AM
|