INSP-Final Inspection | 6/23/2000 | 6/26/2000 | 6/26/2000 | A | PASS |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 06/23/2000 at 11:55:06. Contact: ###-####. Final ok for certificate of completion. 6/26/00 2:57:26 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/5/2000 | 5/8/2000 | 5/8/2000 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/05/2000 at 16:26:46. Contact: ###-####. Reinsp. ok to cover. 5/9/00 11:35:06 AM
|
INSP-Sprinkler Rough-in/Hydro | 5/5/2000 | 5/5/2000 | 5/5/2000 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/05/2000 at 10:24:25. Contact: ###-####. Need tenting, 2 hds. overspaced, 3 hds. not installed. 5/8/00 9:10:21 AM
|