INSP-Final Inspection | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 9/12/2001 4:27:38 PM
|
INSP-Final Inspection | 7/25/2000 | 7/25/2000 | 7/25/2000 | P | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 07/25/2000 at 11:05:41. Contact: ###-####. Reinsp. fail phone line supervision. 7/26/00 10:41:57 AM
|
INSP-Final Inspection | 7/20/2000 | 7/20/2000 | 7/20/2000 | P | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 07/20/2000 at 07:54:29. Contact: ###-####. Reinsp fail not ready 7/21/00 9:14:08 AM
|
INSP-Final Inspection | 7/19/2000 | 7/19/2000 | 7/19/2000 | P | FAIL |
Joe Tawney
|
|
|
George pager ###-#### Final fail C/N issued. 7/20/00 8:42:36 AM
|
INSP-Sprinkler Rough-in/Hydro | 7/13/2000 | 7/13/2000 | 7/13/2000 | P | PART |
Joe Tawney
|
|
|
sprinkler r/i , hydro , and supply line hydro Kevin ###-#### Spklr. R/I c/N issue.d 7/14/00 8:54:31 AM
|
INSP-Supply line flush | 7/10/2000 | 7/10/2000 | 7/10/2000 | P | PART |
Joe Tawney
|
|
|
###-#### Ok on supply line flush 7/11/00 11:37:14 AM
|