INSP-Final Inspection | 11/2/2000 | 11/3/2000 | 11/3/2000 | P | PASS |
Joe Tawney
|
|
|
Doug ###-#### Reinsp Ok for certificate of completion on spklr system 11/6/2000 7:56:33 AM
|
INSP-Final Inspection | 10/27/2000 | 10/30/2000 | 10/30/2000 | P | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail C/N issued 10/31/2000 7:48:57 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/23/2000 | 10/24/2000 | 10/24/2000 | A | PART |
Joe Tawney
|
|
|
###-#### OK on above & under ground hydro tests. Also see FIR00-00524 10/25/2000 7:59:14 AM
|
INSP-Supply line flush | 10/2/2000 | 10/3/2000 | 10/3/2000 | A | PART |
Joe Tawney
|
|
|
###-####
OK on supply line flush and OK to cover garage area
10/3/2000 12:24:09 PM
|
INSP-Sprinkler Rough-in | 9/28/2000 | 9/28/2000 | 9/28/2000 | P | PART |
Joe Tawney
|
|
|
###-#### OK to cover area in Retort room 9/29/2000 8:01:59 AM
|
INSP-Sprinkler Rough-in | 9/21/2000 | 9/20/2000 | 9/20/2000 | A | PART |
Joe Tawney
|
|
|
Added by Inspector: 406 On 9/21/2000 OK to cover in gathering area
|
INSP-Sprinkler Rough-in/Hydro | 9/18/2000 | 9/19/2000 | 9/19/2000 | A | PART |
Joe Tawney
|
|
|
OK to cover canopy. OK to insulate Gathering area. 9/19/2000 12:24:02 PM
|
INSP-Sprinkler Rough-in | 9/13/2000 | 9/13/2000 | 9/13/2000 | P | PART |
Joe Tawney
|
|
|
SAM-- ###-#### R/I OK to cover in lobby area 9/14/2000 12:42:41 PM
|
INSP-Sprinkler Rough-in | 6/27/2000 | 6/28/2000 | 6/28/2000 | A | PART |
Joe Tawney
|
|
|
brad ###-#### ok on supply line cover 6/28/00 2:20:06 PM
|