Permit Information
Permit NumberFIR00-00405
StatusFinaled
Name TREASURE VALLEY FIRE
Site Address 200 W FRONT ST
Project NameSPR CRTHOUSE&TENANTS
Customer Number 
ePlanReview 
Description
*ADA COUNTY COURTHOUSE* To install fire sprinklers in the shell and finished tenant/s of the 1st, 3rd, 4th, 5th and penthouse floors in this (new) 6 story building, except for the 2 lease spaces on the southeast and southwest corners of the building per approved plans. Also standpipe system throughout. Basement to be used for parking, other floors to be used for government offices, courtrooms and ancillary spaces. NOTE: This building is to be fully fire sprinklered. This fire sprinkler project is to be submitted in stages. All work per UFC. Installation to conform to NFPA 13 (overhead) and 24 (underground supply), 14 (standpipes) and any other related installation guidelines accepted by the Fire Department, per Boise City Ordinance. This permit is attached to: BLD00-01649. Underground supply fire permit is: FIR00-00514. Basement, 1st floor and standpipe system fire permit is: FIR00-00405, 2nd floor fire permit is: FIR00-00527. *JWA*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/28/200112/28/200112/28/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 12/28/2001 9:48:52 AM
INSP-Sprinkler Rough-in11/20/200111/20/200111/20/2001PPART
DetailsRick Jackson
###-#### 4tha dn 5th floor heads in corridor complete 11/20/2001 7:15:19 PM
INSP-Sprinkler Rough-in/Hydro11/7/200111/8/200111/8/2001APART
DetailsRick Jackson
###-#### RICK basement wet system hydro okay only 11/8/2001 8:28:21 AM
INSP-Sprinkler Rough-in/Hydro11/6/200111/7/200111/7/2001APART
DetailsRick Jackson
###-#### RICK basement dry system hydro okay 11/8/2001 7:55:26 AM
INSP-Sprinkler Rough-in/Hydro11/5/200111/5/200111/5/2001PPART
DetailsRick Jackson
###-#### RICK okay on hydro for stanpipe and pump areas only 11/5/2001 2:29:11 PM
INSP-Sprinkler Rough-in/Hydro11/2/200111/2/200111/2/2001PCANC
DetailsRick Jackson
###-#### RICK wrong permit called in. 11/2/2001 1:53:50 PM
INSP-Sprinkler Rough-in/Hydro10/30/200110/30/200110/30/2001PPART
DetailsRick Jackson
###-#### RICK hydro test on penthouse okay 10/30/2001 2:06:37 PM
INSP-Sprinkler Rough-in/Hydro10/25/200110/25/200110/25/2001PPART
DetailsRick Jackson
###-#### basement dry system hydro okay 10/25/2001 2:28:08 PM
INSP-Sprinkler Rough-in/Hydro10/17/200110/17/200110/17/2001PPART
DetailsRick Jackson
893-091 rick fifth floor hydro okay 10/17/2001 3:20:16 PM
INSP-Sprinkler Rough-in/Hydro10/2/200110/2/200110/2/2001PPART
DetailsRick Jackson
###-#### rick 4th floor east side hydro okay 10/2/2001 3:33:17 PM
INSP-Sprinkler Rough-in/Hydro9/27/20019/27/20019/27/2001PPART
DetailsRick Jackson
###-#### rick hydro okay on 3rd floor east 9/27/2001 3:06:24 PM
INSP-Sprinkler Rough-in/Hydro9/24/20019/24/20019/24/2001PPART
DetailsRick Jackson
###-#### rick 4th floor west hydro okay 9/24/2001 1:45:31 PM
INSP-Sprinkler Rough-in/Hydro8/23/20018/23/20018/23/2001PPART
DetailsRick Jackson
rick ###-#### 3rd floor west system hydro okay; 2nd floor showers on west side okay to cover; sally port okay to cover 8/23/2001 11:44:47 AM
INSP-Sprinkler Rough-in/Hydro8/16/20018/17/20018/17/2001APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/16/2001 at 12:16:29. Contact: ###-####. 2 floor hydro okay east side 8/17/2001 12:55:39 PM
INSP-Conference8/14/20018/15/20018/15/2001APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/14/2001 at 10:22:05. Contact: ###-####. okay to cover hard lid areas on 3-4-5 floors in bathrooms, showers and courtroom vestibules 8/15/2001 8:54:13 AM
INSP-Sprinkler Rough-in/Hydro8/1/20018/1/20018/1/2001PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/01/2001 at 07:51:55. Contact: ###-####. first floor hydro okay 8/1/2001 3:57:03 PM
INSP-Sprinkler Rough-in/Hydro7/23/20017/24/20017/24/2001APASS
DetailsRick Jackson
Rick ###-#### hydro on 1st floor west system okay. requested plans for the retail spaces on first floor 7/24/2001 11:37:24 AM
INSP-Sprinkler Rough-in/Hydro7/12/20017/12/20017/12/2001PPART
DetailsRick Jackson
Added by Inspector: 409 On 7/12/2001 2:47:00 PM underground hydro okay
INSP-Supply line flush6/26/20016/27/20016/27/2001APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/26/2001 at 13:02:05. Contact: ###-####. underground flush okay 6/27/2001 9:37:55 AM
INSP-Conference3/21/20013/22/20013/22/2001APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/21/2001 at 11:52:33. Contact: ###-####. walked the entire building. systems not complete, corrrections needed for earthquaking hangers, ec. 3/22/2001 10:26:25 AM
INSP-Conference1/29/20011/29/20011/29/2001PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 01/29/2001 at 08:39:52. Contact: ###-####. r/i for penthouse only - okay 1/29/2001 3:40:48 PM
INSP-Sprinkler Rough-in/Hydro1/11/20011/11/20011/11/2001APART
DetailsRick Jackson
preliminary walk through of building with rick of TVFP. reviewed plans - city plans are in ricks plan desk in the building 1/11/2001 3:29:19 PM