Permit Information
Permit NumberFIR00-00418
StatusFinaled
Name C&S FIRE PROTECTION INC
Site Address 928 W MAIN ST
Project NameSPR IDANHA
Customer Number 
ePlanReview 
Description
(THE IDANHA HOTEL) This building is fire sprinklered per 1994 UCBC provisions to allow it to be too tall and too big. To convert floors 2 through 6 of a former hotel to apartment units (53 renovated units). Work is to include upgrade of the existing fire sprinkler system to meet current NFPA 13 (1996) installation requirements throughout. Also included is new Class 1 standpipes. Related new projects are: a new 2-hr stair enclosure, a fire alarm system, seismic upgrade, two apartments accessible to the disabled, two street level entrance canopies, a new built up roof covering, all per approved drawings, engineering, and plan review conditions on file. This permit does not establish a Certificate of Occupancy for any tenant in the basement or on the first floor. Floor zoning was negotiated and allowed modification by Dave Miller (Fire Department) for 3 separate zoned areas: Basement, First Floor, and Apartments. DRH99-00218 *JWA* (07/13/00). BLD99-03148 and demolition permit BLD99-03653 was approved.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/21/20022/21/20022/21/2002PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 2/21/2002 3:19:33 PM
INSP-Final Inspection2/4/20022/5/20022/5/2002APASS
DetailsRick Jackson
###-#### BRETT
INSP-Sprinkler Rough-in/Hydro10/5/200110/5/200110/5/2001PPART
DetailsRick Jackson
Scheduled by Inspector: 409 On 10/5/2001 2:31:08 PM hydro of complete system okay 10/5/2001 5:12:29 PM
INSP-Sprinkler Rough-in6/15/20016/15/20016/15/2001APART
DetailsRick Jackson
Added by Inspector: 409 On 6/15/2001 9:49:37 AM concealed spaces to be rocked or filled with insulation
INSP-Sprinkler Rough-in/Hydro3/6/20013/7/20013/7/2001PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/06/2001 at 16:26:49. Contact: ###-####. peter shotts okay to cover 3/7/2001 4:06:11 PM
INSP-Sprinkler Rough-in/Hydro12/19/200012/20/200012/20/2000PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/19/2000 at 15:56:48. Contact: ###-####.
INSP-Sprinkler Rough-in/Hydro11/22/200011/22/200011/22/2000PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/22/2000 at 08:36:50. Contact: ###-####. ///// dry standpipe and floors 3-6 pass hydro test only. 11/22/2000 4:10:57 PM
INSP-Sprinkler Rough-in/Hydro11/16/200011/20/200011/17/2000PCANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/16/2000 at 16:31:52. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/17/2000 at 17:54:39.
INSP-Sprinkler Rough-in11/7/200011/9/200011/9/2000APART
DetailsRick Jackson
Scheduled by Inspector: 409 On 11/7/2000 4:05:07 PM 9:00 ###-#### oksy to cover 4th floor only 11/9/2000 9:49:26 AM
INSP-Sprinkler Rough-in/Hydro11/7/200011/7/200011/7/2000PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/07/2000 at 08:17:43. Contact: ###-####. will reschedule for 11/9 11/7/2000 4:07:56 PM
INSP-Sprinkler Rough-in/Hydro10/3/200010/3/200010/3/2000PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/03/2000 at 09:38:09. Contact: ###-####. okay to cover rooms on 5th floor only 10/3/2000 4:24:35 PM