Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR00-00439
StatusFinaled
Name GRINNELL FIRE PROTECTION
Site Address 11311 W CHINDEN BLVD
Project NameSPR HP #5-UPGR(PHASE III)
Customer Number 
ePlanReview 
Description
HEWLETT PACKARD BUILDING 5-UPGRADE (PHASE III) * THE COMPLETE UPGRADE OF FIRST FLOOR; ADD A SERVER EQUIPMENT ROOM ON THE WEST MECHANICAL MEZZANINE; FOUR NEW VERTICAL MECHANICAL SHAFTS FROM THE MEZZANINES UP THROUGH THE ROOF. ADDING TO EXISTING STAIRWELL STRUCTURE AT ROOF ACCESS; RAISED NON-COMBUSTIBLE FLOOR SYSTEM AND RAMPS. SPRINKLER SYSTEM UPGRADES TO BE PER UFC AND INSTALLED PER NFPA 13. ALL PER THE APPROVED PLANS, NOTES & ATTACHMENTS THERE TO. BLD00-01050 DR#00-00002; CUP99-00134 *JWA*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/8/20018/8/20018/8/2001APASS
DetailsJoe Tawney
Added by Inspector: 406 On 8/8/2001 10:57:04 AM
INSP-Sprinkler Rough-in10/10/200010/10/200010/10/2000PPART
DetailsJoe Tawney
r/i- carrie digital pager ###-#### OK to cover main floor area 10/10/2000 5:54:39 PM